Ten Bears Environmental assisted a large bank client with assessing potential environmental risks associated with its acquisition of a smaller bank. Our client was seeking to strengthen their presence in Delaware, Maryland, and Virginia by acquiring a smaller bank with 56 branch offices in the mid-Atlantic region. The client engaged the Ten Bears project team to evaluate the location, condition, and quantity of hazardous and regulated materials at each of the 56 branch offices in preparation for their proposed renovations. Each of the 56 bank branches were evaluated within a period of approximately one month to meet the aggressive schedule required by the client.